![]() |
||
Rosatom starts pilot operation of a fuel fabrication facility for the BREST-OD-300 fast reactor
The Federal Service for Environmental, Technological and Nuclear Supervision (Rostechnadzor) has issued a license to Siberian Chemical Combine (an enterprise of Rosatom Nuclear Fuel Division in Seversk, Tomsk Region) to operate a nuclear installation of the Unit for fabrication and refabricati... Rosatom starts construction of unique power unit with BREST-OD-300 fast neutron reactor The construction of a 300 MW nuclear power unit with an innovative lead coolant BREST-OD-300 fast reactor has begun at the site of the Siberian Chemical Combine (an enterprise of Rosatom-subsidiary TVEL Fuel Company) in Seversk, Tomsk region (South-West Siberia)... |
ROSATOM starts testing of unique equipment for BREST-OD-300 nitride fuel fabrication Rosatom starts installation of the BREST-OD-300 4th generation reactor 441 nuclear units are operating in the world, 52 units are under construction Rosatom will manufacture unique equipment for the BREST-OD-300 power unit Nuclear News Ticker - February 11, 2021 Nuclear News Ticker - November 26, 2020 |
Hero of the day ![]() Reactor pressure vessel of Xudapu NPP Unit 4 has been installed in design position VVER-1200 reactor is a cylindrical vessel with an elliptical bottom, inside which there is the core and the internals. The length of the equipment is 13 meters, the diameter is 4.5 meters, and the weight is 320 tons. INTERVIEW
Rosatom OPINION
CNNC |