Forum   Contacts   RSS
AtomInfo.Ru


Flushing of all safety systems to the open reactor starts at Unit 7 of Tianwan NPP


One of the most important process stages - flushing of all safety systems to the open reactor has started at Unit 7 of Tianwan NPP (China), being constructed with participation of Rosatom companies...


Global workshop on SMRs and MRs deployment held in Hainan

The Interregional Workshop on Key Considerations Regarding Infrastructure Development to Support SMRs and MRs Deployment was jointly held by the International Atomic Energy Agency (IAEA) and the China Atomic Energy Authority (CAEA) and undertaken by Hainan Nuclear Power Co...

Reactor pressure vessel of Xudapu NPP Unit 4 has been installed in design position

The reactor pressure vessel has been installed in the design position at the construction site of Xudapu NPP Unit 4 (China), which is being built with participation of Rosatom enterprises...

China offers the world a solution through nuclear technology applications

For a long time, the International Atomic Energy Agency (IAEA) and the China Atomic Energy Authority (CAEA) have been committed to promoting the safe and peaceful use of nuclear technology worldwide, benefiting human health and living environments by creating a series of initiatives to strengt...


CNNP releases its first tech service brand

China to open 12 facilities for cooperation

CNNC and EDF Sign a Comprehensive Cooperation Agreement in Beijing

First overseas Hualong-1 unit passes acceptance in Pakistan

Hero of the day

Russia and Myanmar signed an intergovernmental agreement for the construction of a small modular reactor

Russia and Myanmar signed an intergovernmental agreement for the construction of a small modular reactor

The intergovernmental agreement regulates the conditions and main directions of interaction between the parties within the framework of implementation of the 110 MW SMR project with the possibility of further expansion up to 330 MW.



INTERVIEW

Rosatom

Rosatom
Pietro Barabaschi held a meeting with the management of the Institute and saw around the facilities for high-tech components manufacturing of the future plant.


OPINION

CNNC

CNNC
the 400-ton toroidal field coil TF08 of the ITER was successfully hoisted onto the sub-assembly of the Vacuum Vessel Module 1, marking another milestone in the sector module sub-assembly (SMSA).


Search: