Rosatom starts afterburning of minor actinides in a fast reactor
PFBR-500 - start of fuel loading Fuel loading into the reactor core will begin today at the PFBR unit under construction in India - also known as PFBR-500, a demonstration unit with a fast sodium reactor... ROSATOM installs vessel of MBIR research reactor in design position Installing the reactor vessel in its design position is a significant achievement of the work of a large team of like-minded scientists, engineers, designers, and builders... Rosatom starts supplies of nuclear fuel for CFR-600 fast reactor Elemash Machine-building Plant, a fuel fabrication enterprise of Rosatom TVEL Fuel Company, has dispatched the first batch of nuclear fuel to China for the CFR-600 fast neutron reactor... In 2022, the first Russian NPP power block running fully on renewable fuel is to be launched Vladimir Poplavsky: It is Too Early to Compare Lead to Sodium |
ROSATOM manufactures first bundles of BN-800 MOX fuel with minor actinides MBIR became a participant of the BRICS GRAIN International Platform TVEL ships fuel for CFR-600 fast reactor launch Westinghouse and Ansaldo Nuclear will collaborate on the development of a fast lead reactor IFRES - the future of Chinese fast program Russian specialists present reports at IAEA Conference on Fast Reactors TVEL shipped equipment to China for testing CFR-600 TVEL Elemash Machine-building plant launches new manufacturing site for CFR-600 fabrication BN-800 fast reactor undergoes the first full refueling with MOX fuel FR21 International Conference on Fast Reactors and Related Fuel Cycles will be hosted in Beijing The first batch of MOX fuel was loaded into the reactor at the Beloyarsk NPP TVEL Fuel Company of Rosatom Supplied Fuel for China Experimental Fast Reactor TVEL will supply nuclear fuel for China CFR-600 fast-neutron reactor Rosatom Launches Batch Production of MOX Fuel for Fast Neutron Reactor CEFR completes 100% power test |
Hero of the day Core Catcher for Unit 3 has been delivered to the Construction Site of El-Dabaa NPP The vessel delivering the components of the Core Catcher for Unit 3 left the port of Novorossiysk and arrived to the construction site of the El-Dabaa NPP at the end of June. INTERVIEW
CNNC OPINION
Han Yongjiang |