|
Hero of the day Rosatom starts installation of the BREST-OD-300 4th generation reactor The steel reactor baseplate with the total weight of 165 tons has been installed. The workers have also loaded into the reactor shaft the first part of the reactor vessel - the lower tier of the containment. INTERVIEW
CNNC OPINION
WANO |