Russia May Build New Aircraft Carrier by 2023 – Designer RIA Novosti, PUBLISHED 05.02.2014 The development and construction of a new aircraft carrier for the Russian navy could take about 10 years, a St. Petersburg-based ship design bureau said Monday. Sergei Vlasov, general director of the Nevskoye design bureau, said the overall cost of the ship could range between 100 and 250 billion rubles ($2.8-7.1 billion). “If the ship will be armed with a variety of weaponry, its cost will skyrocket, but if it will carry only air defense systems, the cost will be less,” the official said. Vlasov said his bureau could design both a nuclear-powered and conventional version of the aircraft carrier. The former would have a deadweight of up to 85,000 metric tons, while the latter – up to 65,000 tons. The nuclear-powered ship would be able to carry some 70 aircraft and helicopters, while the conventional vessel – up to 55, he said. Vlasov added that the new carrier would serve as a seaborne platform for new-generation fixed- and rotary-winged aircraft, in particular a fifth-generation fighter set to replace the Su-33 multirole fighter aircraft currently in service, as well as unmanned aerial vehicles (UAV). According to Vlasov, the Russian navy needs at least four aircraft carriers: two for the Northern Fleet and two for the Pacific Fleet. At present, Russia has only one aircraft carrier, the Admiral Kuznetsov, built in 1985, with a displacement of 55,000 metric tons, a crew of 1,500 and capability to carry more than 50 aircraft. Topics: Nuclear ships, Russia Other news: Russia to Lend Hungary $13.7Bln for Nuclear Plant The deal was announced during a state visit to Moscow by Hungarian Prime Minister Viktor Orban and was hailed by Russian President Vladimir Putin. Russia to Triple Uranium Production in Next 2 Years – Rosatom In 2015 we will reach 8,400 tons. Rosatom Boosts Foreign Orders Portfolio to $74 Bln Rosatom signed in Helsinki an expected deal with Finnish nuclear consortium Fennovoima on the construction of a 1,200-megawatt Hanhikivi-1 nuclear reactor in Pyhajoki, northwest Finland. |
Hero of the day We are currently working with the Nuclear Decommissioning Authority (NDA) on this approach, which was submitted in response to their February 2012 call for alternative proposals. We appreciate that the UK is in the early stages of their policy development activities and are pleased to be involved in such important work. INTERVIEW
Yanko Yanev OPINION
Joint Plan of Action |