Rostov-1 is disconnected from the network AtomInfo.Ru, PUBLISHED 30.11.2014 The first unit of the Rostov NPP in Russia has been disconnected from the network at November 29. The thermal power of unit has been reduced to 10%. There was not any violation of limits and conditions of safe operation of the equipment. This event is rated as "out of scale" on the INES system. Topics: Safety, Russia, Volgodonsk NPP Other news: Fuel loading completed on Rostov-3 The completion of the unit is going ahead of schedule. Russia and Iran broaden the cooperation in the peaceful uses of atomic energy Contract for construction of two power units of Bushehr Phase II was signed. Spent assembly removal is completed at Fukushima Daiichi-4 180 fresh assemblies are still left in the pool. |
Hero of the day Congratulatory greetings to Anatoly Zrodnikov Anatoly Zrodnikov was born November 20, 1944 in the city of Zaraysk (Moscow region). After graduating in 1969, he joined the IPPE, where he was working at different positions. INTERVIEW
Nuclear Veterans for the Future OPINION
Falling Wednesday |