Balakovo-2 is connected to the grid after shutdown AtomInfo.Ru, PUBLISHED 29.12.2014 The Unit No. 2 of the Balakovo NPP was connected to the grid at the night of December 27 The unit was shutdown on December 24 under the permitted urgent request to the power system dispatchers for repair of the turbine generator stator. Topics: Safety, Russia, Balakovo NPP Other news: Rostov-3 is connected to the grid The work on the fourth unit construction goes as scheduled. Vermont Yankee closure will negatively affect the economy of the region The plant will be closed at the end of December. TEPCO has unloaded all assemblies from spent fuel pool of Fukushima Daiichi-4 The unloading was launched on November 18, 2013 and ended on 22 December 2014. |
Hero of the day All equipment fitted into the four self-propelled track-type platforms. On one of those was placed a reactor, on the second - control unit, on the third - heat exchanger, and on the forth, the last one - turbine. INTERVIEW
Lev Kochetkov OPINION
Falling Wednesday |