Forum   Contacts   RSS
AtomInfo.Ru


ANU Energy receives first delivery of uranium

AtomInfo.Ru, PUBLISHED 16.05.2022

The ANU Energy OEIC Ltd (ANU Energy) physical uranium fund announced the receipt of the first batch of uranium.

"Under ANU Energy's supply agreement with Kazatomprom, the first full delivery ofuranium oxide was made to the Fund on 12th of May 2022," the fund said in a statement.

"The Fund now has this stock in its full possession at Cameco Corporation's Port Hope/Blind River facility in Ontario, Canada."

Kazatomprom is one of the investors of the ANU Energy Fund.

Topics: Uranium, Kazakhstan, Canada


Other news:

Russian specialists present reports at IAEA Conference on Fast Reactors

A total of 70 reports by Russian participants were presented at the conference.

Specialists of SSC RIAR have successfully completed the modernization of the VK-50 reactor

This is the first and only operating pressurized boiling reactor with natural coolant circulation in the country.

Ghana will decide on the site before the end of the year

Four candidate sites are currently being explored.


Hero of the day

Hongyanhe-6 is connected to the grid

Hongyanhe-6 is connected to the grid

A CPR-1000 reactor developed by the Chinese corporation CGN is installed on the unit. According to PRIS, the thermal power of the reactor is 2905 MWt, the electrical power of the unit is 1119 MWe gross and 1061 MWe net.



INTERVIEW

FR22 concluded its work

FR22 concluded its work
The International Conference on Fast Reactors and Related Fuel Cycles: Sustainable Clean Energy for the Future (FR22) concluded its work at the IAEA headquarters in Vienna.


OPINION

AtomInfo.Ru

AtomInfo.Ru
At present, PWR light water reactors are the backbone of China's nuclear power industry. At the next stage of development, fast reactors should appear in the country, and fusion energy will become the third stage. In parallel with the development of reactor technologies, the development of the necessary fuel cycles is underway.


Search: