Reactor was started on the Ural nuclear icebreaker AtomInfo.Ru, PUBLISHED 30.05.2022 Specialists of the Baltic Plant conducted the start-up of the reactor unit on the Ural nuclear icebreaker (project 22220). The left-side reactor was brought to a minimally controlled power level and the starting equipment was calibrated. Topics: Nuclear ships, Russia Other news: Russian specialists present reports at IAEA Conference on Fast Reactors A total of 70 reports by Russian participants were presented at the conference. Specialists of SSC RIAR have successfully completed the modernization of the VK-50 reactor This is the first and only operating pressurized boiling reactor with natural coolant circulation in the country. Ghana will decide on the site before the end of the year Four candidate sites are currently being explored. |
Hero of the day First Concrete laid at Xudapu NPP Power Unit 4 in China First concrete ceremony has taken place at Xudapu NPP Unit 4 constructed under the Russian VVER-1200 design. The construction has reached its active phase. Xudapu NPP Unit 3 is also in the active stage of construction. INTERVIEW
FR22 concluded its work OPINION
AtomInfo.Ru |