Rosenergoatom has received licenses from Rostechnadzor for the construction of units No. 7 and No. 8 of the Leningrad NPP AtomInfo.Ru, PUBLISHED 11.01.2024 Rosenergoatom has received licenses from Rostechnadzor for the construction of nuclear installations of power units No. 7 and No. 8 of the Leningrad NPP, according to the concern's website. Earlier, in order to obtain licenses, license applications were sent to Rostechnadzor with sets of documents justifying the safety of power units under construction and confirming the readiness of the Leningrad NPP for their construction. The validity period of the permit is set for 15 years. The commissioning of the new units are scheduled for 2029 and 2031, respectively. Topics: Leningrad NPP, Russia Other news: HTR-PM starts commercial operation It is an important pathway for optimizing energy structure, ensuring reliable energy supply, and contributing to the dual carbon goal. Lepse Floating Technical Base Dismantlement Project has been successfully implemented To discharge spent nuclear fuel, the Lepse was placed in a specially designed and built onshore sheltering site. This made it possible to prevent any weather effects. IAEA has issued a technical document on global inventories of secondary uranium supplies The document provides a comprehensive assessment of publicly available information on current secondary uranium supplies, including at the regional and national levels. |
Hero of the day ROSATOM completed production of RITM-200 for Chukotka icebreaker This is the last reactor that the company is manufacturing under the valid contract for the supply of power units for the new generation nuclear-powered ships. After having been prepared for transportation, the reactor will be delivered to the Baltic Plant. INTERVIEW
CNNC OPINION
WANO |